Board of Directors Project Page
| « Charter | Section 14 | Support Services |
Charter | Section 15 | Facilities Plan
FACILITIES PLAN
1. Facilities - SLSPA proposed proposes the construction of an approximately 28,000 square foot building on the campus of Highland High School. The estimated cost of the facility is $3.5 million. The facility will be financed, constructed, and owned by Salt Lake City School District. SLCSD will then lease the facility to the School. [Comment 1]
The following outlines the pProposed features of the SLSPA facility:



2. Open Space - It is proposed that students of SLSPA will use existing open space at Highland High School for P.E. and free time.
3 comments
If we do get specific, I think we're looking at a building approximately 100x100 located on the south end of the Highland structure. We might want to mention that the whole facility will be built in phases as financing and enrollment allows and that before these facilities are built, SPA will lease space from Highland by negotiation with the Highland principal.
This post has 5 feedbacks awaiting moderation...
Leave a comment
Contact |
Skin modified by Cicada
Gallery for SPA
Copyright 2009 Salt Lake School for the Performing Arts
2166 South 1700 East Room A103, Salt Lake City, UT 84106 | 801-466-6700


Questions and Suggestions